2. Operation Data
Operation data is supplied with the operation manuals in the delivered package and con-
tains the following required to use the gas chromatographs.
●
Process conditions and measurement range
●
Instrument specifications and operating conditions
●
Standard sample for calibration
●
Column system and column
●
Miscellaneous data
Chromatogram, base line, repeatability, power supply voltage variation, etc.
●
Analyzer flow diagram and installation
●
Parts composition table
●
General connection diagram
●
Sampling system diagram (only if supplied by Yokogawa)
●
Is the System Ready?
Before reading this manual, the following preparations must have been completed.
●
The system must be unpacked and installed in the correct place.
●
The piping for the utility gases such as carrier and calibration gases must be com-
pleted, followed by leak checking.
●
The wiring for the power supply and others must be completed.
If these have not been completed yet, see the Installation Manual (TI 11B03A03-13E).
After completion, return to this manual and do the following:
●
If the system power is on, turn off the power.
●
Shut off all the gases at the flow control units.
Please read the following respective cautions (General Precautions, Caution of
using Explosion-Protection Instruments, on Piping Construction, and on Piping
Work) before installing and using the GC1000 system.