Terminology, 1 operation terminology, Terminology -1 – Yokogawa GC1000 Mark II Process Gas Chromatograph User Manual
Page 20: Operation terminology -1

<2. Terminology >
2-1
IM 11B03A03-01E
3rd Edition : Aug. 23. 2006-00
2.
Terminology
2.1
Operation Terminology
Term
Description
Notes
Remote Mode
Local Mode
Status
Process
Manual
Lab
Operation Mode
Run
Pause
Stop
Measurement Status
Stream Sequence
Stream (continuous)
Stream (1 cycle)
Calibration
Validation
Method
Analysis Cycle
Warming Up Time
Peak Detection Stop Time
Pause Time
Purging
Status accessible without password,
LCD/key: used only for reference
GCMT: connectable
Status accessible by entering password
LCD/key: used for changing settings
Normal measurement and calibration
Manual operation
Measurement with automatic peak detection, like a lab GC
Mode in which measurement is running
Mode in which measurement pauses
Mode in which measurement stops
Continuously measures streams in order specified in Stream Sequence
Continuously measures the specified stream
Measures the specified stream once
Performs calibration of the specified number
Performs validation of the specified number
Configures action timing of various valves and other parameters
Time from start (0 second) to stop of analysis
Time for displacement in sample streams
Time to stop peak detection of chromatogram compulsorily
Time for measurement pause
Displacement of the gas in the pressurized/Type X purged enclosures
with a protection gas
T0201.EPS