<4. Outline of Software >
4-15
IM 11B03A03-01E
• Semiautomatic Calibration
The same action is performed when the calibration is specified at any timing during analy-
sis.
(1)
An action when Calibration 1 is specified while the measurement status is in Stream
Sequence 1 and the operation mode is in Run, is shown in Figure 4.15.
W7
W8
W3
W1
W2
S1
S2
S7
W7
S7
S8
S3
Select the Calibration 1
Time
Stream Sequence 1
Stream Sequence 1
Calibration 1
S1 to S8: Analysis cycles for streams 1 to 8
W1 to W8: Warming up time for streams 1 to 8
F0415.EPS
Figure 4.15
Action of Semiautomatic Calibration (1)
(2)
An action when calibration 1 is specified while the measurement status is in Stream
(continuous) 1 and the operation mode is in Run, is shown in Figure 4.16.
W7
W8
W1
W1
W1
S1
S1
S7
W7
S7
S8
S1
Select the Calibration 1
Time
Stream (Cont) 1
Stream (Cont) 1
Calibration 1
S1 to S8: Analysis cycles for streams 1 to 8
W1 to W8: Warming up time for streams 1 to 8
F0416.EPS
Figure 4.16
Action of Semiautomatic Calibration (2)
(3)
When Calibration 1 is specified while the measurement status is in Stream Sequence
1 to 4 or in Stream (continuous) 1 to 31 and the operation mode is in Stop or in Pause,
the measurement status is immediately changed to Calibration 1 and then Calibration
1 is performed. After Calibration 1 has been completed, the previous measurement
status is retrieved and the operation mode turns to Stop. The same action is per-
formed when Calibration 1 or 2 is specified.