Operation, 1 operational conditions for positioning operation – IAI America RCP3-RA2BR User Manual
Page 30
24
7. Operation
7. Operation
7.1
Operational Conditions for Positioning Operation
By following the procedures below, check whether the operation is available.
[1] Operation
Check the operational conditions [1] to [5].
[1] Load installation orientation (horizontal, upright, vertical)
[2] Stroke L (mm)
[3] Maximum speed V (mm/s)
[4] Acceleration a (G)
[5] Loading capacity W (kg)
Installation orientation
Horizontal
Upright
Vertical
This manual is related to the following products: