4.2 Preliminary Power-Off Check List

Make the following checks of the installation before proceeding

further into the start-up procedure:

1. Check to see that the sample and supporting gas installation is in

accordance with the specifications called for in the installation
and application sections of the manual (Chapter 3). Be sure that
the supporting gases are of the proper composition and are
connected to the correct fittings at the rear of the analyzer.

2. Check to see that the electrical installation conforms to the

instructions contained in the installation section (Chapter 3) and
on the input-output diagram.

3. Remove the top cover and check to see that the printed circuit

boards and cables are firmly seated in their respective sockets.

4. Confirm that recorder and alarm connections are properly made.

4.3 Powering Up the Unit

Before applying power to the analyzer for the first time perform the

following checks:

1. Make sure that the proper power 120/220 VAC 50/60 Hz is

available.

2. Connect the AC power cord to the rear panel and then plug the

other end into the mains supply. As soon as power is established,
the unit will turn on.

3. Check that the Power, CPU, and COM LEDs illuminate and the

Teledyne Logo screen appears on the display.