beautypg.com

Teledyne GC-Pro/FID - Gas Chromatograph User Manual

Page 41

background image

GC-Pro FID

Installation

Teledyne

Analytical

Instruments

27

Parity

none

Stop

Bits

1

Message Interval

Sent at the end of each cycle.

3.3.3 Gas Connections

The analyzer gas connection diagram identifies the various gas

connection points as to function and location. Figure 3-1 shows the gas
connection points for the standard instrument without the optional auto
calibration module. If the optional auto calibration manifold is present,
sample and span gas connections would be made to labeled fittings on
the manifold.

Figure 3-3: Gas Connections

Note: For instruments without the auto calibration option, the

customer must provide means of switching sample and
span gas to the analyzer. It is recommended that you use
a tee with appropriate valves as opposed to disconnecting
the sample gas connection when span gas is required.

Gas connections to the instrument are made at the 1/8”or 1/4”

stainless steel tube fittings provided on the rear panel. Note that the