beautypg.com

Teledyne 2010A - Split architecture thermal conductivity analyzer User Manual

Page 94

background image

2 Installation

Model 2010A

2-8: Part II

Teledyne Analytical Instruments

the system is ready to test. Before plugging either of the units into their
respective power sources:

Check the integrity and accuracy of the gas connections. Make
sure there are no leaks.

Check the integrity and accuracy of the electrical connections.
Make sure there are no exposed conductors

Check that sample pressure is between 3 and 40 psig, according
to the requirements of your process.

Power up the system, and test it as follows:

1. Repeat the Self-Diagnostic Test as described in Part I, chapter 4,

section 4.3.5.