Installation – Teledyne 2010A - Split architecture thermal conductivity analyzer User Manual
Page 23

Teledyne Analytical Instruments
Thermal Conductivity Analyzer
Part I: Control Unit
Part I 3-
Installation
Installation of the Model 2010A Analyzer includes:
1. Unpacking
2. Mounting
3. Gas connections
4. Electrical connections
5. Testing the system.
3.1 Unpacking the Analyzer
The analyzer is shipped ready to install and prepare for operation.
Carefully unpack the analyzer and inspect it for damage. Immediately report
any damage to the shipping agent.
3.2 Mounting the Control Unit
The Model 2010A Control Unit is for indoor use in a general purpose
area. It is NOT for hazardous environments of any type. It must be protected
from:
• Direct sunlight
• Drafts of air
• Shock and vibration
• Temperatures below 30 °F (-1 °C) or above 110 °F (43 °C).
Locate the 2010A as close as possible, subject to the above conditions,
to the Analysis Unit.
The standard model is designed for flush panel mounting. Figure 3-1 is
an illustration of the 2010A standard front panel and mounting bezel. There
are four mounting holes—one in each corner of the rigid frame. Figure 3-1a
contains the hole pattern dimensions. See the outline drawing, at the back of
this manual for overall dimensions.
On special order, a 19" rack-mounting panel can be provided. For rack