beautypg.com

Teledyne 2010A - Split architecture thermal conductivity analyzer User Manual

Page 84

background image

1-2: Part II

Teledyne Analytical Instruments

1 Introduction

Model 2010A

Figure 1-1: Outline Diagram of 2010A Analysis Unit

REFERENCE IN This is the gas input from the flowing

reference gas source. This gas connector should
have a flowmeter with a range of 20-100 cc/
min.

SPAN/ZERO

These gas inputs have the same requirements as
the sample in connection.

VENTS

Sample and reference gas vents must be re-
turned to areas of equal pressure.

The actual tubing size and connection type will depend on actual

options selected. See outline diagram in the rear of the manual for piping
requirements.

1.3

Electrical Connector Panel

Figure 1-2 shows the internal Electrical Connector Panel. Cables enter

the housing through access ports (visible in Figure 1-1), and connect to
terminals inside the housing. The connectors and controls are described
briefly here. They are described in detail in the Installation, Operation, and
Maintenance chapters, as appropriate.