beautypg.com

Fulton FB-S Horizontal Firetube Boiler User Manual

Page 61

background image

The Fulton Companies*FB-S Series Manual*Version 2010-0820 rev. 3/5/13

Page 61

3. Six Month Maintenance

Warning

The boiler must be completely cold before carrying out any of the following

procedures.

a) Ensure that the following valves are SHUT:

i.

The main steam stop valve

ii.

The feed water isolating valve

iii.

The fuel (gas/oil) valves

b) Ensure that the power supply to the boiler is switched OFF.

Caution

The boiler and attaching parts will retain heat long after the boiler has been

shut down. Always use protective clothes and extreme caution when

working on a hot boiler.

c) Empty the boiler. It will be necessary to allow air into the boiler before it will drain via

the main blowdown valve.

d) Remove the hand hole and manhole doors and thoroughly inspect the internal

surfaces of the boiler, paying particular attention to the junction of the tubes

with the front tube plate and the tubes for signs of pitting. Any deposits should

be removed and your water treatment specialist consulted. Ensure there are no

accumulated deposits of sludge in the bottom of the boiler.

e) Remove the feed water dispenser, inspect and clean.

f)

Replace the man hole and hand hole door gaskets, refer to Section FITTING

NEW GASKET for fitting procedures

g) Open the boiler front access door with the burner mounted on it as described

below. It will be necessary to disconnect the gas supply from the gas train and oil

supply from the oil lines to allow the door to swing open.

h) Remove water column plug at cross section and clean nipple to boiler.