Note

As well as removing sludge from the boiler, a second and equally

important function is to maintain the TDS (totally dissolved solids) level to

within the required limits. The amount of blowdown, and hence time

required, it dependent on the amount of TDS in the raw water supply, the

percentage condensate return, water treatment chemicals added and the

number of the hours a day operation. In order to establish the required

blowdown rate, consult your water treatment specialist who will

recommend a water treatment program in terms of appropriate

chemicals and the required blowdown rate, which takes these factors

into account.

Water Level Gauge Blowdown

a) Blowdown the water level gauge set by opening the gauge blowdown valve A and

closing the top and bottom gauge valves B and C in sequence.

b) On completion of the blowdown procedures, ensure all isolation valves are open,

and all blowdown valves are SHUT (all handles vertical).

5. To Shut Down the Burner

Short Term (hours)

a) Turn the burner On/Off/Reset Switch on the Burner Control Panel to OFF.

b) The burner will stop firing, post-purge and then stop.

Flame Programmer

Pressure Controller

Pressure Switches

Level Probes

Steam Stop Valve

Surface Blowdown
Connection

Level Controller

Feedwater Connection