Section 5 – Operation

Boiler starting

STOP! Make sure you have read any followed all previous safety information.

Check with local authorities where approval for start-up is required. In some

localities, final inspection of services may be required.

In general, ensure that the boiler area is in conformance with established boiler

room requirement. Review national and local codes.

Carry out the following procedure on the initial start up of the boiler and on every

subsequent occasion when restarting the boiler after a shut down.

1. Filling the Boiler

a) Ensure the following valves are OPEN

i.

Main Steam Valve

ii.

Steam pressure gauge isolating valve

iii.

All valves in the water feed line

iv.

Water gauge isolating valves

v.

Air release valves

b) Ensure the following valves are SHUT

i.

Surface and bottom blowdown valves

ii.

Water gauge blowdown valves

iii.

All valves in the gas/oil train to the burner

c) Ensure that the Burner On/Off/Reset Switch is set to OFF

d) Ensure that the Pump On/Off switch is in the PUMP OFF position, and that the

Hand/Off/Auto Switch is in the Off position.

e) Place the Pump On/Off Switch to the PUMP ON position, or Hand/Off/Auto in the

Auto position.

f)

The feed pump should start and fill the boiler to the pump off level and then switch

off.