The Fulton Companies*FB-S Series Manual*Version 2010-0820 rev. 3/5/13

Page 28

Open all necessary oil shut-off valves. Do not run compressors,

pumps, or metering units without oil.

f) Before connecting electrical current to any component, be sure the

supply voltage is the same as that specified on the component

nameplates.

g) Make certain that the operator in charge is properly instructed in the

operation and maintenance procedures.

Note

The pressure vessel must be cleaned before running the boiler after

installation.

12. Cleaning

Steam Piping

a) Steam and water piping systems connected to the boiler may contain

oil, grease, or foreign matter. The impurities must be removed in order

to prevent damage to pressure vessel heating surfaces. On a steam

system, the condensate should be wasted until tests show the

elimination of undesirable impurities. During the period that

condensate is wasted, attention must be given to the treatment of the

raw water used as make-up so that an accumulation of unwanted

materials or corrosion does not occur. For more information, contact

your local authorized boiler representative.

Pressure Vessel

a) The waterside of the pressure vessel must be kept clean from grease, sludge, and

foreign material. Such deposits, if present, will shorten the life of the pressure

vessel, will interfere with efficient operation and functioning of control, of safety

devices, and possibly cause unnecessary and expensive re-work, repairs, and

down-time.

b) The installation and operating conditions that the boiler will be subjected

to should be considered, and cleaning of the waterside of the

pressure vessel should be provided during the course of initial start-

up.

c) The pressure vessel and the steam and return lines, in effect, represent

a closed system. Although the steam and return (condensate) lines

system may have been previously cleaned, it is possible that: