Introduction

This operating manual presents information that will help to properly operate and care for the equipment.

Study its contents carefully. The unit will provide good service and continued operation if proper operating

and maintenance instructions are followed. No attempt should be made to operate the unit until the

principles of operation and all of the components are thoroughly understood. Failure to follow all

applicable instructions and warnings may result in severe personal injury or death.

These instructions must not be considered as a complete code of practice, nor should they replace

existing codes or standards which may be applicable.

The requirements and instructions contained in this section generally relate to the Fulton model FBS.

When installing a packaged unit, this entire section should be read to ensure that the installation work is

carried out correctly.

Prior to shipment, the following tests are made to assure the customer the highest standards of

manufacturing.

a) Material inspections

b) Manufacturing process inspections

c) ASME welding inspection

d) ASME hydrostatic test inspection

e) Electrical components inspection

f) Operating test

g) Final engineering inspection

h) Crating inspection

Note

The installation of the boiler should be carried out by competent personnel in accordance with the

standards of the National Fire Protection Association. All state and jurisdictional codes beyond

the scope of the applicable ASME boiler and pressure vessel codes, for its corresponding

classification, should be followed in all cases. Jurisdictional authorities must be consulted prior

to installation.