beautypg.com

Fulton FB-S Horizontal Firetube Boiler User Manual

Page 19

background image

The Fulton Companies*FB-S Series Manual*Version 2010-0820 rev. 3/5/13

Page 19

Section 3 – Installation

General

Note

It is essential that the installing shall be undertaken only by suitably qualified and

experienced personnel. Installation should comply with appropriate local and state codes

and standards.

1. Locating the Boiler

a) The boiler should be closed in dry surroundings on a level base, making sure that

there is sufficient room around the boiler to enable the operator and/or the

maintenance engineer to gain access to all parts of the boiler. Check location for

ease of water supply and electrical connections.

b) Place the boiler on a non-combustible floor with clearances to unprotected

combustible materials, including plaster or combustible supports.

c) It is necessary to have enough clearance from the floor to the ceiling for

removing of the burner and have the following clearance from boiler for servicing:

36” Min

36” Min

36” Min

Clearance

48” Min