Fulton FB-S Horizontal Firetube Boiler User Manual
Page 19

The Fulton Companies*FB-S Series Manual*Version 2010-0820 rev. 3/5/13
Page 19
Section 3 – Installation
General
Note
It is essential that the installing shall be undertaken only by suitably qualified and
experienced personnel. Installation should comply with appropriate local and state codes
and standards.
1. Locating the Boiler
a) The boiler should be closed in dry surroundings on a level base, making sure that
there is sufficient room around the boiler to enable the operator and/or the
maintenance engineer to gain access to all parts of the boiler. Check location for
ease of water supply and electrical connections.
b) Place the boiler on a non-combustible floor with clearances to unprotected
combustible materials, including plaster or combustible supports.
c) It is necessary to have enough clearance from the floor to the ceiling for
removing of the burner and have the following clearance from boiler for servicing:
36” Min
36” Min
36” Min
Clearance
48” Min