beautypg.com

Burkert Type 2300 User Manual

Page 35

background image

35

Maintenance, cleaning

Removing the control cone set

Spindle

Dowel pin

Control cone

Graphite seal

Fig. 29: Replacing the control cone set

NOTE!

Important information for the problem-free and safe func-
tioning of the device!
The sealing face of the control cone must not be damaged.

Procedure:

Knock out the dowel pin with a suitable pin punch.
Pin punch ø 4 mm, for spindle diameter 10 mm.
Pin punch ø 5 mm, for spindle diameter 14 mm.

Remove control cone.

Replacing packing gland
PEEK spindle guide (series production status up to April 2012):

Unscrew the spindle guide with the aid of the installation wrench

13)

and an open-end wrench.

VA spindle guide (Series production status since April 2012):

Unscrew spindle guide using a modified socket wrench

13)

.

SP22:

Unscrew the VA spindle guide with the aid of an open-end wrench.

Packing gland

PEEK
spindle guide

Spindle

Installation tool

Packing gland tube

Series pro-
duction status
up to April 2012

Fig. 30: Replacing packing gland (PEEK spindle guide)

13)

The installation wrench or modified socket wrench is available
from your Bürkert sales office.

english

Type 2300