Test Menu

41

1.6.2.3 Relay Protection Test Results screen

The Relay Protection Test Results screen will display the results for the tests performed using
the user-defined tests.

Figure 1-19 Relay protection test results screen

Test settings and results are saved to the hard-drive with the report name as TestNumber_Time.

Table 1-15 Selections and controls

Level

Select the fault level to display the test settings.

User-Defined Test Settings

Summarizes the test performed at the level shown.

Test Results

Once the test is performed, it displays the time sequence of circuit breaker
status and the device that actuated the circuit breaker (Shunt Trip or Flux
Shifter).

Expected Trip Time

Expected trip time automatically calculated from the pickup, delay band
settings, and beaker clearing time.

Observed Trip Time

Observed trip time displayed after the test is performed.

Test Summary LED

Specifies the test results by comparing the observed trip time with the
expected trip time.

Green

Successful (within +/– 20% of expected time)

Red

Unsuccessful

Gray

Test Aborted