Page 9


Supplier

Incremental Delivered

Price, $/ MMBtu

BTU/lb

Tons/Month

Coal A

$0.0000

11,200

45,000

Coal B

$0.1995

12,500

30,000

Coal C

$0.2466

11,300

15,000

Coal D

$0.3463

11,300

25,000

Coal E

$0.5011

11,000

30,000

Coal F

$0.6343

12,200

20,000

Coal G

$0.8309

11,500

20,000

Coal H

$1.8857

11,500

20,000

Total Tons

205,000

Total Tons Non “Coal A”

160,000

Alternative to

“Coal A” Source

% of Total Coal

Burned (less

Coal A)

Equivalent Tons

MMBtu

Monthly

Savings

Annual Savings

Coal B

100

40,320

1,008,000

$201,096

$2,413,052

Total Savings Assuming Replacement with 100% of Lowest Cost Alternative

$2,413,052

Alternate to

“Coal A” Source

% of Total Coal

Burned (less

Coal A)

Equivalent Tons

MMBtu

Monthly

Savings

Annual Savings

Coal B

18.8

7,560

189,000

$37,706

$452,466

Coal C

9.4

4,181

94,500

$23,304

$279,644

Coal D

15.6

6,969

157,500

$54,542

$654,507

Coal E

18.8

8,591

189,000

$94,708

$1,136,495

Coal F

12.5

5,164

126,000

$79,922

$959,062

Coal G

12.5

5,478

126,000

$104,693

$1,256,321

Coal H

12.5

5,478

126,000

$237598

$2,851,178

Total Savings Assuming Replacement with Historical Proportion of Alternatives

$632,473

$7,589,673

Table 11





Table 10

Table 12