GE P&W FuelSolv - Slag Control Treatment Program at EKPC Spurlock Station User Manual
Page 9
Technical Paper
Page 9
Supplier
Incremental Delivered
Price, $/ MMBtu
BTU/lb
Tons/Month
Coal A
$0.0000
11,200
45,000
Coal B
$0.1995
12,500
30,000
Coal C
$0.2466
11,300
15,000
Coal D
$0.3463
11,300
25,000
Coal E
$0.5011
11,000
30,000
Coal F
$0.6343
12,200
20,000
Coal G
$0.8309
11,500
20,000
Coal H
$1.8857
11,500
20,000
Total Tons
205,000
Total Tons Non “Coal A”
160,000
Alternative to
“Coal A” Source
% of Total Coal
Burned (less
Coal A)
Equivalent Tons
MMBtu
Monthly
Savings
Annual Savings
Coal B
100
40,320
1,008,000
$201,096
$2,413,052
Total Savings Assuming Replacement with 100% of Lowest Cost Alternative
$2,413,052
Alternate to
“Coal A” Source
% of Total Coal
Burned (less
Coal A)
Equivalent Tons
MMBtu
Monthly
Savings
Annual Savings
Coal B
18.8
7,560
189,000
$37,706
$452,466
Coal C
9.4
4,181
94,500
$23,304
$279,644
Coal D
15.6
6,969
157,500
$54,542
$654,507
Coal E
18.8
8,591
189,000
$94,708
$1,136,495
Coal F
12.5
5,164
126,000
$79,922
$959,062
Coal G
12.5
5,478
126,000
$104,693
$1,256,321
Coal H
12.5
5,478
126,000
$237598
$2,851,178
Total Savings Assuming Replacement with Historical Proportion of Alternatives
$632,473
$7,589,673
Table 11
Table 10
Table 12