5. Assembly
54
PNEG-720-G2 12" and 16" Series II Sweep
8. Connect the 1" x 48" liquid-tight flex conduit to the pivot tube using one 1" conduit coupling and
one 1" liquid-tight flex conduit coupling.
9. Connect the 1" x 48" liquid-tight flex conduit to one of the junction boxes using one 1" liquid-tight
flex conduit coupling. Connect the leads as required.
10. The customer is to provide proper power cord protection between the pivot assembly and the
sump transition.
Figure 5AL
11. The multi-conductor power cord can be connected with the 14 AWG/3 wire, 14 AWG/4 wire and
10 AWG/4 wire cords in an explosion proof junction box.
12. Use the plugs provided with the junction box to close the holes not being used.
13. If applicable, assemble the cord plugs to the other end of each of the cords. The 14 AWG/4 wire
cord requires the (GC03670) plug. The 8 AWG/4 and the 10 AWG/4 wire cord requires the
(GC03668) plug. The 14 AWG/3 wire cord requires the (GC03672) plug. Otherwise, hard wire
the motor cords into the control panel.
CAUTION
The plugs are different for each cord and MUST be assembled correctly. This is
done to prevent the cords from being plugged into the control panel incorrectly.