STARTUP WITH DRYER FULL OF WET GRAIN
STARTUP WITH DRYER FULL OF WET GRAIN
STARTUP WITH DRYER FULL OF WET GRAIN
STARTUP WITH DRYER FULL OF WET GRAIN
STARTUP WITH DRYER FULL OF WET GRAIN
1. Run all fans
fans
fans
fans
fans at 180
°
to 200
°
whenever grain is not moving.
2. Grain will take five to seven min-
utes per point of moisture to be-
removed. Five minutes for 25%
and up, six minutes for 20% to
25% and seven minutes for 15%
to 20%.
Example:
25-15% = 10pt. removal or 60
minutes of burner
burner
burner
burner
burner operation.
3. Running dry and cool will be by
batch mode for single fan
fan
fan
fan
fan dry-
ers.
4. Set speed control as close to
expected capacity as possible,
or use the chart on page 36. Set
moisture control as listed on
page 36. Adjust temperatures to
those listed on page 36. Start un-
loading grain with the moisture
control switch in the ON posi-
tion. Run for 1 hour, then in-
crease speed by 20% to start
the MOISTURE CONTROL hold
light cycling. Reset LOW speed
to 1/2 of HIGH speed dial.
Example:
25% Wet grain dryed to 15%-
model 1114 all heat.
•Set moisture control switch to
the ON position.
•Set MOISTURE CONTROL to 95
°
•Set speed control at 20% of full
speed.
•Set LOW speed dial at 10% of
full speed or 1/2 of HIGH speed.
5. Dryer will cycle erratically for an
hour after speeding up. Adjust-
speed so the MOISTURE CON-
TROL hold light is on 10% to 50%
of the time. After the moisture
control light has cycled for at least
an hour check moisture, and ad-
just moisture control accordingly.
END OF SEASON DRYER SHUTDOWN
END OF SEASON DRYER SHUTDOWN
END OF SEASON DRYER SHUTDOWN
END OF SEASON DRYER SHUTDOWN
END OF SEASON DRYER SHUTDOWN
EMPTYING DRYER
EMPTYING DRYER
EMPTYING DRYER
EMPTYING DRYER
EMPTYING DRYER
STARTUP & OPERATION FOR ALL PORTABLE DRYERS
STARTUP & OPERATION FOR ALL PORTABLE DRYERS
STARTUP & OPERATION FOR ALL PORTABLE DRYERS
STARTUP & OPERATION FOR ALL PORTABLE DRYERS
STARTUP & OPERATION FOR ALL PORTABLE DRYERS
DRYER CLEANUP
DRYER CLEANUP
DRYER CLEANUP
DRYER CLEANUP
DRYER CLEANUP
Metering rolls
Metering rolls
Metering rolls
Metering rolls
Metering rolls
•
Swing open hinged bottom cov-
bottom cov-
bottom cov-
bottom cov-
bottom cov-
ers
ers
ers
ers
ers.
•
Hose or blowout around meter-
meter-
meter-
meter-
meter-
ing roll access doors
ing roll access doors
ing roll access doors
ing roll access doors
ing roll access doors.
•
Oil all metering roll bushings
metering roll bushings
metering roll bushings
metering roll bushings
metering roll bushings
(use lubricating oil only not
WD40 or cutting type oils).
•
Change oil in WINN SMITH
SCR gear boxes
gear boxes
gear boxes
gear boxes
gear boxes.
•
Oil and grease chain and all
other grease points.
Gas lines
Gas lines
Gas lines
Gas lines
Gas lines
•
Empty and clean screens and
screens and
screens and
screens and
screens and
traps
traps
traps
traps
traps.
•
Inspect and clean burner ori-
burner ori-
burner ori-
burner ori-
burner ori-
fice and cup.
fice and cup.
fice and cup.
fice and cup.
fice and cup.
General outside areas
General outside areas
General outside areas
General outside areas
General outside areas
•
Power wash dryer if possible.
Thermostat/thermometer
Thermostat/thermometer
Thermostat/thermometer
Thermostat/thermometer
Thermostat/thermometer
•
Blowout or brush clean.
Motors
Motors
Motors
Motors
Motors
•
Grease sparingly both end
end
end
end
end
bearings.
bearings.
bearings.
bearings.
bearings.
Control Cabinets
Control Cabinets
Control Cabinets
Control Cabinets
Control Cabinets
•
Vacuum and clean all cabinets
cabinets
cabinets
cabinets
cabinets.
•
Check door seals
door seals
door seals
door seals
door seals.
•
Check all other electrical box
electrical box
electrical box
electrical box
electrical box
covers and seals.
covers and seals.
covers and seals.
covers and seals.
covers and seals.
Augers
Augers
Augers
Augers
Augers
•
Check hanger bearings
hanger bearings
hanger bearings
hanger bearings
hanger bearings for
looseness and inspect for dam-
age.
1. Set OUT OF GRAIN timer for 6-
8 minutes.
2. Run hopper tank out of grain and
allow timer to shutdown dryer.
3. With lower auger
lower auger
lower auger
lower auger
lower auger OFF run
burners
burners
burners
burners
burners for 5-6 minutes per
point of moisture to be removed
to completely dry grain. Cool,
then empty dryer.