Maintenance, Closing down, Spare parts list – M&C TechGroup SP35-H... Operator's manual User Manual
Page 13: Appendix

13
Gas sampling and gas conditioning technology
2-1.9.6MD
14
MAINTENANCE
Maintenance of the heated sample tubes is mainly limited to the change of the screwed-on or heated
pre-filter (SP30-H1.1-V) and the check of the sealings. For the change or cleaning of the pre-filter the
gas sample probe with the heated probe tube and the pre-filter has to be dismounted.
It is difficult to give any recommendations as to a particular maintenance cycle. Depending on process
conditions, a meaningful maintenance cycle must be elaborated for the specific application.
W A R N I N G !
The safety instructions specific to the plant and process are to be
consulted prior to any maintenance work!
W A R N I N G !
When working during operation:
High surface temperatures!
Touching the surfaces can result in burns. Wear protective gloves
and protect against unauthorized access !
15
CLOSING DOWN
For closing down no particular measures need to be taken.
16
SPARE PARTS LIST
Wear, tear and replacement part requirements depend on specific operating conditions.
Recommended spare parts
Part No.
Description
20 S 9195
Pre-filter for probe SP30-H1.1-V. Large stainless steel insitu filter V20-2/30. length: 520mm,
60mm a.d., filter porosity: 2µm operating temperatures max 550°C. Material: SS316.
90 S 2077
Flange gasket DN65 PN6B (67). Material: Novapress.
17 APPENDIX
More product documentation is available on our Internet catalogue:
Sample tubes series SP
Document:
2-1.1.0.6
Prefilter series SP
Document:
2-1.1.0.8