Information in copy/move and history displays, Acknowledge button, 6 process status icons – EVS IPDirector Version 4.4 - March 2008 Part 1 User's Manual User Manual
Page 40: Process status icons, Rocess, Tatus, Cons

IP Director Version 4.4 – User Manual – Part 1: Introduction
EVS Broadcast Equipment - – March 2008
Issue 4.4.B
29
I
NFORMATION IN
C
OPY
/M
OVE AND
H
ISTORY
D
ISPLAYS
The following information is available in the Copy/Move and History displays:
•
clip name
•
initial clip location
•
action type, i.e. copy or move
•
final clip location
•
progress bar indicating how many percents of the move or copy has been
performed
•
date and time when the copy/move started
•
date and time when the copy/move ended
•
process status: “in progress” or “finished”
•
user who performed the copy/move.
A
CKNOWLEDGE BUTTON
When the users have read a message, they can acknowledge it by clicking the
ACK button. The Acknowledge button changes the background of the selected
message to grey. This helps the user distinguish the messages that have been
dealt with from the ones that have not.
2.6.6 P
ROCESS
S
TATUS
I
CONS
The background colour of the Status icons provides information on the status of
the processes that run in the background:
•
When the background colour is green, the process is running or the connection
is established.
•
When the background colour is yellow, the process is not running or the
connection is not established.