beautypg.com

Information in copy/move and history displays, Acknowledge button, 6 process status icons – EVS IPDirector Version 4.4 - March 2008 Part 1 User's Manual User Manual

Page 40: Process status icons, Rocess, Tatus, Cons

background image

IP Director Version 4.4 – User Manual – Part 1: Introduction

EVS Broadcast Equipment - – March 2008

Issue 4.4.B

29

I

NFORMATION IN

C

OPY

/M

OVE AND

H

ISTORY

D

ISPLAYS

The following information is available in the Copy/Move and History displays:

clip name

initial clip location

action type, i.e. copy or move

final clip location

progress bar indicating how many percents of the move or copy has been

performed

date and time when the copy/move started

date and time when the copy/move ended

process status: “in progress” or “finished”

user who performed the copy/move.

A

CKNOWLEDGE BUTTON

When the users have read a message, they can acknowledge it by clicking the
ACK button. The Acknowledge button changes the background of the selected
message to grey. This helps the user distinguish the messages that have been

dealt with from the ones that have not.

2.6.6 P

ROCESS

S

TATUS

I

CONS

The background colour of the Status icons provides information on the status of

the processes that run in the background:

When the background colour is green, the process is running or the connection

is established.

When the background colour is yellow, the process is not running or the

connection is not established.