Hardware installation & initial setup, Front panel leds and back panel ports, Front panel leds – ZyXEL Communications Broadband Security Gateway P-312 User Manual
Page 35: Chapter 2 hardware installation & initial setup, 1 front panel leds and back panel ports, 1 front panel leds
P312 Broadband Security Gateway
Hardware Installation & Initial Setup
2-1
Chapter 2
Hardware Installation & Initial Setup
This chapter shows you how to connect the hardware and perform the initial setup.
2.1 Front Panel LEDs and Back Panel Ports
2.1.1 Front Panel LEDs
The LEDs on the front panel indicate the operational status of the Prestige.
Figure 2-1
Front Panel
The following table describes the LED functions:
Table 2-1
LED functions
LEDs
Function Indicator
Status
Active
Description
PWR
Power
Green
On
The power adapter is connected to the Prestige.
Off
The system is not ready or failed.
On
The system is ready and running.
SYS
System
Flashing
The system is rebooting.
Green
Off
The 10M LAN is not connected.
On
The Prestige is connected to a 10M LAN.
10M LAN
LAN
Flashing
The 10M LAN is sending/receiving packets.
Off
The 100M LAN is not connected.
100M LAN
Orange
On
The Prestige is connected to a 100Mbps LAN.