beautypg.com

Ratings, Gold cgi gas-fired water boiler — boiler manual – Weil-McLain GOLD CGI 550-110-710/0107 User Manual

Page 67

background image

Part Number 550-110-710/0107

6

GOLD CGi Gas-Fired Water Boiler — Boiler Manual

Ratings

Table 10 Boiler ratings

DOE

13b

CGi boilers for residential radiant panel systems, converted gravity heating systems or other low water tempera-

ture applications should be installed with balancing valves and bypass piping equal to the supply and return

size to avoid excessive flue gas condensation due to lower operating water temperatures. For alternate piping,

contact your Weil-McLain sales office. CSA design certified for installation on combustible flooring. Tested for

50 psi working pressure.

Boiler

model

number

DOE

Heating

capacity

(Btuh)

0–2,000 feet

altitude

2,000–4,500 feet

altitude

Net

I=B=R

ratings

(Btuh)

Boiler
water

content
(gallons)

DOE

Seasonal

efficiency

(% A.F.U.E)

Vent

size

Input

(Btuh)

Output

(Btuh)

Input

(Btuh)

Output

(Btuh)

(Note 1)

(Note 2)

(Note 3)

(Note 4)

CGi-25

42,000

50,000

42,000

45,000

38,000

37,000

1.5

84.0

3"

CGi-3

51,000

60,300

51,000

54,300

46,200

45,000

1.5

85.1

3"

CGi-4

85,000

100,000

85,000

90,000

76,000

74,000

2.1

84.0

3"

CGi-5

100,000

119,700

100,000

108,000

90,000

87,000

2.7

83.3

3"

CGi-6

140,000

167,000

140,000

150,000

126,000

122,000

3.3

83.3

3"

CGi-7

167,000

200,000

167,000

180,000

150,000

145,000

3.8

83.0

3"

CGi-8

194,000

233,000

194,000

210,000

175,000

169,000

4.4

82.7

3"

1. Add “PIN” for natural gas boiler - “PIL” for propane gas boiler.

Notes

2. Based on standard test procedures prescribed by the United States Department of Energy.
3. Net I=B=R ratings are based on net installed radiation of sufficient quantity for the requirements of the building

and nothing need be added for normal piping and pickup. Ratings are based on a piping and pickup allowance
of 1.15. An additional allowance should be made for unusual piping and pickup loads.

4. CGi boilers require special venting, consistent with Category I or III boiler. Use only the vent materials and

methods specified in this manual. Vent diameter shown above is for direct exhaust venting. See Table 3,
page 14, for vent diameter when chimney draft venting.