Operation — sequence
9a
Figure 30 Control module sequence of operation — status light indications
1.
Read Operating instructions
on page 40. This
information is also located on a label on the inside
of the boiler jacket door panel.
.
Raise
room thermostat to call for heat.
3.
Circulator energizes.
If limit circuit is closed, the
inducer starts. After pressure switch proves proper
airflow, control module initiates 30-second pre-
purge.
4.
Control module sparks
the pilot and opens pilot
valve in main gas valve.
a. If pilot
does not
light within 15 seconds, pilot valve
is closed and spark generator is turned off. Control
module initiates a 15-second postpurge, then starts
a new cycle.
b. If pilot
does
light and control module senses flame
current, spark generator is turned off and main valve
opens.
5.
During main burner operation:
a. Control module monitors pilot flame current.
If signal is lost
, main valve closes, spark gen-
erator activates and sequence returns to step
4
.
b.
If power is interrupted
, control system
shuts
off
pilot and main gas valves and restarts at
step
1
when power is restored.
6. In the event the
limit control shuts down the
boiler
— The control module closes the pilot and
main gas valves, but keeps the inducer operating for
15-second postpurge.
— The circulator continues to operate.
.
Lower
room thermostat setting to stop call for
heat. Thermostat is satisfied — Pilot and main gas
valves are closed — Inducer operates for 15-second
postpurge — Circulator is shut off.
8. Boiler is now in the
off cycle
.
9.
Repeat
steps
1
through
6
several times to verify
operation.
10.
Return
the thermostat to normal setting.
11. Set thermostat heat anticipator setting as instructed
in
Figure 32