GOLD CGi Gas-Fired Water Boiler — Boiler Manual

10

Part Number 550-110-710/0107

Figure 5

Air from outdoors — horizontal ducts

Figure 4

Air from outdoors — vertical ducts

Figure 2

Air openings to interior spaces

Figure 3

Air directly through outside wall

Air opening options

Two openings — Air supply from inside the building

1. If the building is of

unusually tight construction

(see definition, next

page), the

building must also be provided with air openings directly

to the outside

, sized and located per Figure 3, Figure 4 or Figure 5.

. Buildings of typical construction should provide adequate combustion

air from natural infiltration, so additional air openings to the building

are not required.

3. See Figure . Provide

two openings

through the interior wall, within

1 inches of the ceiling and the floor, sized per Figure .

Two openings — Air supply directly from outside

1. Air openings must be directly through an outside wall, or into a space

that connects directly to the outside (such as a ventilated attic or crawl

space, for example).

. See Figure 3 —

Openings directly through an outside wall

— provide

two openings

within 1 inches of the ceiling and the floor, sized per

Figure 3.

3. See Figure 4 —

Air supplied through vertical ducts

— provide

two

openings

terminated within 1 inches of the ceiling and the floor, sized

per Figure 4.

4. See Figure 5 —

Air supplied through horizontal ducts

— provide

two openings

within 1 inches of the floor and the ceiling, sized per

Figure 5.

Prepare boiler location — air openings

1e

Air openings must be provided

Combustion air and ventilation openings must comply the National Fuel

Gas Code ANSI Z3.1-latest edition, or applicable local building codes.

Canadian installations must comply with B149.1 or B149. Installation

Codes.

Provide adequate combustion and ventilation air to

assure proper combustion and reduce the risk of severe

personal injury, death or substantial property damage

caused by flue gas spillage and carbon monoxide

emissions.

Combustion air opening location and sizing

requirements depend on the clearances around

the boiler.

Check the boiler placement compared to

Figure 1a, page .

If all clearances are at least equal to Figure 1a,

page 7

, apply the sizing and placement of openings

given on pages 10 and 11.

If ANY clearance is less than Figure 1a, page 7

,

you must provide air openings sized and located as

shown in Figure 1b, page .

DO NOT

apply the sizing

and location information shown on page 10 or 11.