beautypg.com

Toshiba Strata DK Backup User Manual

Page 120

background image

Upgrade

––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

110

DKAdmin/DKBackup

8. Press

Enter

and then select the processor type you are upgrading to; press

Enter

after

selecting the processor (RDTU E/F, Release 3 in this example).

9. If you haven’t backed up the customer database by downloading the original RCTU,

answer

Yes

to

Backup From DK First

; otherwise, answer

No

. Press the spacebar to

make your selection and then press

Enter

.

10. From the screen in

Step 7

above, use the spacebar to change

Backup From DK First

from

No

to

Yes

to download the database from the original processor and press

Enter

.

Note

If you already completed a backup and have a spare customer database for the original
processor, you can answer

No

to the prompt:

Backup from DK First

.

DKAdmin/DKBackup upgrades the database files and displays the screen shown in

Step 13

.

Steps 11

and

12

are skipped.

You are prompted with the message

Upgrading to DK RCTU EF, R3. Are you

sure?

This database is then upgraded before sending it to the “new” processor

11. Use the arrow keys to highlight

Yes

and press

Enter

. You are now prompted with

You

will receive data FROM the DK. Are you sure?

12. Highlight

Yes

and press

Enter

. DKAdmin/DKBackup downloads the following files:

PRGALL, REPALL, NAMEALL, VIDALL, ADMEMOAL, MSGALL, CFALL
(Release 3), MWALL (Release 3), CLID (Release 3). DKAdmin/DKBackup then
upgrades and builds the database. After upgrading the database, the screen in

Step 13

displays.

13. At this point DKAdmin/DKBackup has upgraded the customer database; follow the

instructions on the screens below to change ROMs/Flash Memory on processors and add
cabinets and PCBs as required.

Important!

Remember to turn power off before changing PCBs and cabinets. Then turn the
system back on and perform the steps on the screen below to ensure the
DKBackup and DK system TTY port communication link continues to function
during the remaining upgrade process.

Processor Conversion

PLEASE READ THE FOLLOWING SCREENS AS THEY PROVIDE VERY IMPORTANT
INFORMATION REGARDING THE UPGRADE AND INITIALIZATION PROCESSES.

Please turn DK system power off and add/change cabinets, processor ROM or
RMSS memory and/or RCTU PCBs as required.

IMPORTANT: Do not add PCBs, other than RSIU or PIOU in between existing
PCBs at this time as they will make station port and/or CO line numbers
shift causing the upgraded data to be invalid.

The next screen provides step-by-step instructions for initializing the
system.

Press any key to Continue

This manual is related to the following products: