94 packaging and transportation – Rinnai E75CN User Manual
Page 9
Installation & Servicing Instructions Rinnai E-Series
9
4
Packaging and transportation
4.1 Scope of delivery
The boiler is supplied ready for use.
• Please check if the packaging is intact.
• Check if all the items listed are included in the delivery.
The supply kit is contents:
• Boiler with casing;
• Template;
• Automatic air separator (inside the boiler); • Installation instructions;
• Wall mounting suspension bracket;
• User manual;
• Bronze adapter fittings;
• Service manual;
• 3" PP exhaust adapters (x2);
• Outdoor sensor ARV12
• Plumbing kit
• 3/4" gas shut off valve
• Fixing material consisting of plugs and screws;
4.2 Transportation
The boiler may be damaged when not secured properly.
- Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
- When shipping the boiler must be secured on the transportation equipment to
prevent it from falling off.
- Protect all parts against impacts if they are to be transported.
- Follow the transportation markings on the packaging.
• Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
!
CAUTION