beautypg.com

94 packaging and transportation – Rinnai E75CN User Manual

Page 9

background image

Installation & Servicing Instructions Rinnai E-Series

9

4

Packaging and transportation

4.1 Scope of delivery

The boiler is supplied ready for use.

• Please check if the packaging is intact.

• Check if all the items listed are included in the delivery.

The supply kit is contents:

• Boiler with casing;

• Template;

• Automatic air separator (inside the boiler); • Installation instructions;

• Wall mounting suspension bracket;

• User manual;

• Bronze adapter fittings;

• Service manual;

• 3" PP exhaust adapters (x2);

• Outdoor sensor ARV12

• Plumbing kit

• 3/4" gas shut off valve

• Fixing material consisting of plugs and screws;

4.2 Transportation

The boiler may be damaged when not secured properly.

- Only transport the boiler using appropriate transportation equipment, such as a

handtruck with a fastening belt or special equipment for maneuvering steps.

- When shipping the boiler must be secured on the transportation equipment to

prevent it from falling off.

- Protect all parts against impacts if they are to be transported.
- Follow the transportation markings on the packaging.

• Packaged boilers must always be lifted and carried by two people, or you must

use a handtruck or special equipment for transport.

!

CAUTION

This manual is related to the following products: