beautypg.com

2 clearances from boiler – Rinnai E75CN User Manual

Page 15

background image

Installation & Servicing Instructions Rinnai E-Series

15

clearances to the boiler

table 3

service clearances to the boiler

figure 4

wall

ceiling

For closet installation: clearance is 1” / 25mm from the front.

Low Loss Header

Clearances to combustible and non-Combustible is 0 inch for sides, top, front and floor/ground

0.4"

10

2"
50

Min. 10" /

250mm

15.7"
400

24"
600

5.3.2

Clearances from boiler

Minimum required clearances

to combustibles

Minimum required clearances

to non-combustibles

Recommended

service clearances

All types

A

ll types

A

ll types

inch / mm

inch / mm

inch / mm

Top of boiler

2" / 50

2" / 50

10" / 250

Back of boiler

0"

0"

0

Front of boiler

6" / 150

6" / 150

24" / 600

Left side of boiler

2" / 50

2" / 50

2" / 50

Right side of boiler

2" / 50

2" / 50

2" / 50

Floor / Ground

12" / 300

12" / 300

30" / 762

Vent

0"

0"

0"

This manual is related to the following products: