Installation & Servicing Instructions Rinnai E-Series

54

12.5 Checking the O

2

The O

2

percentage is factory-set. This has to be checked at commissioning,

maintance and faults.

This can be checked by means of the following procedure:
- Remove the black cover of the gas valve by unscrewing the sealed screw.

-

Put the boiler into operation and take care that it can deliver its heat;


Tip: If there is no demand for heat on CH, turn the hot water tap completely open
and measure the O

2

.

-

Press the MODE-button for 5 seconds.

-

The display will show COdE followed by an arbitrary number;

-

Select by means of the

or the

button the code C123;

- Press the Store-button to confirm the code (code blinks 1 x);

-

Press the MODE-button until SERV is shown;

-

Press the STEP-button once until 1 is shown;

alternately 1 and OFF will be shown.

-

Calibrate the O

2

meter ;

-

Place the probe of the O

2

meter into the check point (see fig. 21);

-

Press the

button until the maximum value (in kW) is achieved;

The boiler will burn on full load (value on display in kW)

value in BTU/hr = x3415

-

Check the O

2

percentage:

Natural gas: full load:

between 4.4% and 4.7%

min. load:

between (setting of full load +0.2%) and 6.0%

Propane:

full load:

between 4.8% and 5.1%

min. load:

between (setting of full load +0.2%) and 6.0%

Example:Full load set on 4.6% O

2

(natural gas) then the minimum load setting should

be between 4.8% and 6% O

2

Choose the right O

2

value according the kind of gas (Natural Gas or Propane

Gas). Wrong adjustment may result causing property damage, personal

injury or death.

-

Let the O

2

meter do its measuring procedure.

-

Adjust, if necessary, the adjustment screw to correct the O

2

value

(see fig. 22).

Ending the O

2

measuring procedure:

-

Press the - button until OFF is shown (keep button pressed).

With this the procedure has ended..

- Replace the black cover on the gas valve and fix it with the screw.