beautypg.com

10 5 installation – Rinnai E75CN User Manual

Page 10

background image

Installation & Servicing Instructions Rinnai E-Series

10

5

Installation

5.1 Requirements for the installation room

- The room where the boiler will be installed must always be frost free.

- Do not store or use gasoline or other flammable vapors and liquids in the

vicinity of this or any other appliance.

- Never use or store any chlorinated detergents or halogenated hydrocarbons

(e.g. in spraycans, solvents and detergents, paints, adhesives) in proximity

of the boiler.

- The boiler must be installed in such a way that it is protected from water

(dripping, spraying, rain, etc.) during boiler operation and service (circulator

replacement, condensate trap, control replacement, etc.)

- This boiler is for intended for indoor installations only.

!

DANGER

Products to avoid present in boiler room

and/or around combustion air intake

Spray cans containing chloro-/fluorcarbons
Ammonium and/or ammonium solutions
Permanent wave solutions
Chlorinated waxes and/or cleaners
Swimming pool chemicals based on chlorine
Calcium chloride used for thawing
Sodium chloride used for water softening
Refrigerant leaks
Paint or varnish removers
Hydrochloric acid/muriatic acid
Cements and glues
Antistatic fabric softeners used in clothes dryers
Chlorine-type bleaches, detergents, and cleaning solvents
found in household laundry rooms
Adhesives used to fasten building products and
other similar products

Areas likely to have contaminants

Dry cleaning/laundry areas and establishments
Swimming pools
Metal fabrication plants
Beauty shops
Refrigeration repair shops
Photo processing plants
Auto body shops
Plastic manufacturing plants
Furniture refinishing areas and establishments
New building construction
Remodeling areas
Garages with workshops

This manual is related to the following products: