3content – Rinnai E75CN User Manual
Page 3
Installation & Servicing Instructions Rinnai E-Series
3
Content
1
Safety and general instructions
4
1.1
Designated use
4
1.2
Hazard definitions
4
1.3
Symbol definitions
4
1.4
The following instructions must be followed
5
1.5
Follow these instructions for the space heating water
6
1.6
Tools, materials and additional equipment
6
1.7
Relevant Installation, Service and User manuals
6
1.8
Disposal
6
2
Regulations and guidelines
7
3
Description of the boiler
8
4
Packaging and transportation
9
4.1
Scope of delivery
9
4.2
Transportation
9
5
Installation
10
5.1
Requirements for the installation room
10
5.2
Fitting the boiler
11
5.3
Dimensions
12
5.3.1
Plumbing kits
14
5.3.2
Clearances from appliance
15
5.4
Technical specifications
16
6
Connecting the boiler
17
6.1
Central heating system
17
6.1.1
Plumbing Kit installation
18
6.1.2
Safety valve
19
6.1.3
Low water cut off
20
6.2
Expansion tank
20
6.3
Underfloor heating system (plastic pipes)
21
6.4
Gas supply connection
21
6.4.1.
Gas connection with natural gas
22
6.4.2
Gas connection with propane gas
23
6.5
Hot water supply
24
6.6
Condensate drain pipe
24
6.7
Vent system and air supply system
25
6.7.1
Intake / Exhaust Guidelines
25
6.7.2
Examples vent and air supply systems
26
6.7.3
Installation of the vent system
28
6.7.4
Recommended vent/air intake terminal position
29
6.7.5
Dimensioning of the exhaust and air intake duct
31
6.7.6
Combustion air and vent piping lengths
32
6.7.7
Calculation of compensation factor
33
6.7.8
Room Air System (outdoor combustion air)
34
7
Electrical connections
37
8
Boiler controls
40
8.1
Explanation of the function buttons
41
9
Starting up: Filling and de-aerating the boiler and installation
42
9.1
Requirements of the water system
42
9.2
Filling the heating system
43
9.3
Hot water supply
44
10 Adjustments
46
10.1
Altering adjustments
46
10.2
Activating factory settings (green button function)
49
11 Isolating the boiler
49
12 Commissioning
50
12.1
Testing for gas leaks
51
12.2
Testing the Ignition Safety shut off device
51
12.3
Checking for contamination
52
12.4
Checking of the zero pressure control
53
12.5
Checking the O
2
54
12.6
Measuring the ionization current
55
12.7
Installing the casing
55
13 Maintenance
56
13.1
Periodic examination of venting and boiler
56
13.2
Inspection
56
13.2
Maintenance activities
58
13.3
Warranty
60
14 Parts of the boiler
61
15 Blocks and errors
62
16 Other errors
86
17 Spare parts
92
18 Parts list vent system
102
19 Common venting guidelines
103
Appendix A Outdoor Reset Sensor Data
104