beautypg.com

Raritan Computer Paragon switch User Manual

Page 31

background image

C

HAPTER

2: I

NSTALLATION

23

Note: When following the installation and configuration instructions below, sort the
Selection Menu by Channel ID Number, not by Name. Display the menu by
pressing < F2> and change the sorting method by pressing <F12>.

Important: All Paragon components must be powered ON prior to Z-Series tier installation. All

computers in the Z-chain and all Z4200U components must be powered OFF prior to
installation.

Connect Z-Series Z4200U Z-CIMs as a Tier:
1. Connect a Category 5e UTP cable to the channel port on the Paragon switch reserved for the Z-

CIM chain.

2. Connect the other end of this Category 5e UTP cable to the UTP OUT port on a Z-CIM, which

will be the first Z-CIM in the chain.

3. Connect a computer to the first Z-CIM.

For UKVMSPD Z-CIM:

a.

Connect the 6-pin mini-DIN keyboard and mouse and HD15 video connectors on the
UKVMSPD Z-CIM to computer’s keyboard, mouse, and video ports.

b.

Place the Z-CIM Terminator in the Z-CIM’s UTP IN port.

c.

Power ON computer.

Figure 18 Z-CIM UKVMSPD

For UKVMSC Z-CIM with local port:

a.

Connect DB25 male end of CCPnn cable to DB25 female port on back of a Z-CIM (UKVMSC).

b.

Connect other end to computer’s keyboard, video, and mouse ports.

c.

Place the Z-CIM Terminator in the Z-CIM’s UTP IN port.

d.

Power ON computer.




Figure 19 Z-CIM UKVMSC with Local Port