beautypg.com

Task summary, Foundation configuration, Chapter 3 – Nortel Networks SRG50 User Manual

Page 27

background image

27

SRG50 Configuration Guide

Chapter 3

Task summary

The task summary offers a high level, chronological review of the tasks required to configure the
SRG50. The paths (Xxxx > Yyyy > Zzzz) direct you to the appropriate Business Element Manager
(Element Manager) panels.

Foundation configuration

Foundation configuration refers to configuration that is done as part of BCM50 foundation
activities. The items identified here are significant for SRG operation and main office planning
and installation.

1

Configure the SRG IP address, net mask, and gateway.

Configuration >System > IP Subsystem

External Reference: Installation and Maintenance Guide (NN40020-302)

2

Confirm the number of IP sets and VoIP trunks.

Configuration > Resources > Application Resources

The Licence column indicates the number of resources available.

External Reference: Keycode Installation Guide (NN40010-301)

3

Verify the global telephony settings.

Configuration > Telephony > Global Settings

External Reference: Device Configuration Guide (NN40020-300)

4

Configure the Start DN (determined by the dialing plan).

Administration > Utilities > Reset > Cold Reset Telephony Services button > Cold Reset
Telephony dialog box > Start DN field

Internal Reference:

Basic parameters

on page 67

External Reference: Installation and Maintenance Guide (NN40020-302)

5

Verify the DN length.

i) For local calls between telephones on the SRG.

Configuration > Telephony > Dialing Plan > General > Dialing Plan - General panel >
Global Settings subpanel > DN length (intercom) field

ii) For incoming calls from the PSTN

Configuration > Telephony > Dialing Plan > Public Network > Dialing Plan - Public
Network panel> Public Network Settings subpanel > Public Received number length
field