beautypg.com

Copper wire site requirements, Site wiring requirements – Siemens ADVANCE NETWORK COMMUNICATIONS BOARD/DATANET 2000592-001 User Manual

Page 19

background image

Site Wiring Requirements,

Continued

Table 1-1: Recommended
DataNET Cable,
Continued

Cable Type

Vendors & P/N

Installation Notes

Twisted Pair Copper
Wire used in SEA
2100 Installations

SEA P/N C00128

Belden P/N 9462

Not Recommended for
New Installations

Nominal capacitance
155 pF/m (50 pF/ft.)

Max distance from
analyzer to ANG or
between hubs 225
meters (750 ft)

Copper Wire Site
Requirements

The following information pertains when using copper wire.

See Page 11, CE Installations.

CE Installations

Use approved Conduit wiring method. Conduit may contain multiple
cables. Adhere to all Federal and local electrical code requirements.

NEC Div 2 or Non-
Hazardous Rated Areas

Cable Type: Refer to Table 1-1.

Use Cable Gland wiring method. Each cable gland allows entry of one
cable.

Cenelec Zone 1 or Zone 2
Rated Areas

Cable Type: Recommend Belden 9182 or armored Belden 9182 or
equivalent. The proper cable gland must be used to connect the armor or
shield to the enclosure. Other cables with individually shielded pairs can
be used, but decreased distance is allowed (typically ~800-1000 feet for
typical instrumentation cable).

2000592-001

Installation

9