beautypg.com

7 commissioning, 1 prerequisites for commissioning, 2 basic commissioning - initial power-up – Siemens SIMATIC INDUSTRIAL PC PCIL43 User Manual

Page 33: Commissioning

background image

SIMATIC Rack PC IL 43
Operating Instructions, Edition 09/2005, A5E00432875-01

7-1

Commissioning

7

7.1

7.1

Prerequisites for commissioning

Before you switch on the device, you should verify that the peripherals are connected, i.e.

the keyboard, mouse, monitor and the power supply.

The operating system of your device is preinstalled on the hard disk.

Caution
Risk of damage to the device!
Make sufficient allowances for the device to acquire room temperature before you put it

into use. If condensation develops, wait at least 12 hours before switching on the device.

7.2

7.2

Basic commissioning - initial power-up

The Rack PC operating system is automatically set up the first time you switch on the

device. Procedure:
1. Press the on/off button. The green power LED lights up. The PC performs a POST. During

this self-test, this message appears:

Press to enter SETUP

2. Wait until this message is cleared, then follow the instructions on the screen.
3. Type in the Product Key as required. You can find this key on the "Certificate of

Authentication", in the "Product Key" line.

Notice
The PC may not be switched off when you run setup.
Do not change the default BIOS settings as this will disrupt the operating system installation.

4. Automatic restart
After you have entered all necessary information and after the operating system

setup is completed, the PC is automatically restarted and displays the user interface of the

relevant operating system.
From now on, after you switch on the PC, the user interface of the operating system is

automatically opened when the startup routine is completed.