4 deployment planning, 1 transport, 2 unpacking and checking the delivery unit – Siemens SIMATIC INDUSTRIAL PC PCIL43 User Manual
Page 23: Deployment planning, Transport, Unpacking and checking the delivery unit
SIMATIC Rack PC IL 43
Operating Instructions, Edition 09/2005, A5E00432875-01
4-1
Deployment planning
4
4.1
4.1
Transport
Although the Rack PC has a rugged design, its internal components are sensitive to severe
vibrations or shock. You must therefore protect the PC from severe mechanical stress when
transporting it.
You should always use the original packaging for shipment of the device.
Caution
Risk of damage to the device!
When transporting the PC in cold weather it may be submitted to extreme variations in
temperature. In this situation, make sure that condensation does not develop on or inside
the device.
If condensation develops, wait at least 12 hours before switching on the device.
4.2
4.2
Unpacking and checking the delivery unit
Unpacking the device
Note the following points when you unpack the unit
•
It is advisable not to dispose of the original packing material. Keep it in case you have to
transport the unit again.
•
Please keep the documentation in a safe place. It is required for initial commissioning and
is part of the device.
•
Check the delivery unit for any visible transport damage.
•
Verify that the shipment contains the complete unit and your separately ordered
accessories.
•
Please inform your local dealer of any disagreements or transport damages.
•
Please inform Siemens AG by means of the enclosed SIMATIC IPC/PG quality control
report form.