GE GEFanuc Automation Programmable Control Products TCP/IP Ethernet Communications for the Series 90t-70 PLC GFK-1004B User Manual
Page 5
Contents
v
GFK-1004B
TCP/IP Ethernet Communications User’s Manual – January 1996
Chapter 1
Introduction
1-1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
The Ethernet Communications System
1-1
. . . . . . . . . . . . . . . . . . . . . . . . . . .
The Ethernet Interface
1-2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
The GEnet System Manager (GSM)
1-4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
How to Make it Work
1-6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Quick Guide to the Manual
1-7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 2
Installing the Ethernet Interface
2-1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Ethernet Interface Hardware Overview
2-1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Board Indicators
2-3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Restart Button
2-3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Battery
2-4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Serial Port
2-4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
AUI (Transceiver) Port
2-4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Default Station Address Label
2-4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Serial Number Label
2-4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Procedure 1: Installing the Ethernet Controller Board in the PLC
2-5
Equipment Required to Perform the Installation Procedures
2-5
. . . . . . . . . . . .
Ethernet Controller Board Installation
2-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Procedure 2: Verifying Proper Power-Up of the Ethernet Interface
2-7
Using the GSM “Access Station Manager” Function
2-7
. . . . . . . . . . . . . . . . . . . .
States of the Ethernet Interface
2-8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Powering-Up the Ethernet Interface
2-9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Problems During Power-Up
2-10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Procedure 3: Configuring the Ethernet Interface with
Logicmaster 90-70 (PLC Module Configuration)
2-11
. . . . . . . . .
PLC Systems with CPU Firmware Version 5.03 or Later
2-12
. . . . . . . . . . . . .
PLC Systems with CPU Firmware Versions Prior to 5.03
2-16
. . . . . . . . . . . . .
Procedure 4: Configuring and Downloading a Station
2-20
. . . . . . . . .
Configuring a Station
2-20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Downloading a Station
2-21
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Initiating the Download
2-22
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Problems During the Download
2-23
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
How to Issue the LOAD Command from the Station Manager
2-23
. . . . . . .
Procedure 5: Testing the Ethernet Interfaces on the Network
2-24
. . .
Field Network Test Utility
2-24
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Invoking the Field Network Test Utility
2-25
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Running Field Network Test
2-26
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .