Adept s350 Cobra User Manual
Page 7

5.4 Initial Power-up of the System
Running the Adept ACE Software
5.5 Learning to Program the Adept Cobra s350 Robot
Chapter 6: Optional Equipment Installation
6.2 Removing and Reinstalling the Tool Flange
Mounting Options for User Connections
7.1 Periodic Maintenance Schedule
7.2 Checking of Safety Systems
7.3 Checking Robot Mounting Bolts
7.4 Lubricate Joint 3 Ball Screw
Battery Replacement Time Periods
7.7 Replacing the MB-40R/eMB-40R Amplifier
Remove the MB-40R/eMB-40R Amplifier
Installing a New MB-40R/eMB-40R
7.8 Commissioning a System with an eMB-40R
Safety Commissioning Utilities
Teach Restrict Configuration Utility
Teach Restrict Verification Utility
Chapter 8: Technical Specifications
Adept Cobra s350 User's Guide, Rev. D
Page 7 of 94