beautypg.com

Industrial Data Systems IDS DT200 User Manual

Page 11

background image

DT 200 Users Manual version 1.E

Built In Application Programs

7

pin assignments and sample cable drawings. See

Set Operation Parameters, and

Parameter Functions for other communication setup parameters.

Apply AC Power to the DT200

Remove the bottom cover of the DT200 to provide access to the DT200 circuit board.
Connect the output of the power supply to terminal block TB1 (Power AC/DC) on the

DT200 circuit board. Re-assemble the DT200. Plug the power cord into the power

supply. Plug the power supply cord to main power.
Note: The socket outlet should be installed near the equipment and shall be easily

accessible.

On power-up, the DT200 performs the following tests:
1. Keyboard Scan - the keyboard is scanned to verify that no keys are engaged.

2. Memory Test - the DT200 displays "rTEST" while it performs a memory test on

internal memory. If a problem is encountered during the test, an error message is

displayed.

3. Lamp Test - all segments on the numeric display and all LED's are turned on for 5

seconds.

To exit the above power on test functions, press the CLEAR key during any test. This is

possible only if the DT200 has not been locked.
The DT200 is now ready for

initialization, calibration, and configuration. Continue with

Setup Guide.

Setup Guide

Setup the DT200 in the following order:

Initialize to Factory Defaults

The DT200 is initialized at the factory. It must be re-initialized if the program memory

(EPROM) or the parameter memory (EAROM) is replaced. The Initialize function

clears the memory and sets the configuration parameters to their default values. Use

parameter function 70 described in

Parameter Functions to initialize the DT200.

NOTE: Setup must be performed after the DT200 is initialized.