Industrial Data Systems IDS DT200 User Manual
Page 11
DT 200 Users Manual version 1.E
Built In Application Programs
7
pin assignments and sample cable drawings. See
Set Operation Parameters, and
Parameter Functions for other communication setup parameters.
Apply AC Power to the DT200
Remove the bottom cover of the DT200 to provide access to the DT200 circuit board.
Connect the output of the power supply to terminal block TB1 (Power AC/DC) on the
DT200 circuit board. Re-assemble the DT200. Plug the power cord into the power
supply. Plug the power supply cord to main power.
Note: The socket outlet should be installed near the equipment and shall be easily
accessible.
On power-up, the DT200 performs the following tests:
1. Keyboard Scan - the keyboard is scanned to verify that no keys are engaged.
2. Memory Test - the DT200 displays "rTEST" while it performs a memory test on
internal memory. If a problem is encountered during the test, an error message is
displayed.
3. Lamp Test - all segments on the numeric display and all LED's are turned on for 5
seconds.
To exit the above power on test functions, press the CLEAR key during any test. This is
possible only if the DT200 has not been locked.
The DT200 is now ready for
initialization, calibration, and configuration. Continue with
Setup Guide.
Setup Guide
Setup the DT200 in the following order:
Initialize to Factory Defaults
The DT200 is initialized at the factory. It must be re-initialized if the program memory
(EPROM) or the parameter memory (EAROM) is replaced. The Initialize function
clears the memory and sets the configuration parameters to their default values. Use
parameter function 70 described in
Parameter Functions to initialize the DT200.
NOTE: Setup must be performed after the DT200 is initialized.