Cable status function – ProSoft Technology PS-QS-1x10-0781 User Manual

Page 69

background image

FieldServer Configuration Manual

Page 69 of 90

FieldServer Technologies 1991 Tarob Court Milpitas, California 95035 USA Web: www.fieldserver.com

Tel: (408) 262-2299 Fax: (408) 262-2269 Toll Free: (888) 509-1970 email: [email protected]

10.3.8.2 Cable Status Function

15

Cable Status Function provides the cable status between the FieldServer and the Nodes. If the cable is good it is
indicated by a 1 in the Cable Status Data Array. The offset number in the Data Array is as follows:

Data Array Offset Description

Data Array Offset Description

0

P1 on Primary – Serial

16

P1 on Secondary – Serial

1

P2 on Primary – Serial

17

P2 on Secondary – Serial

2

P3 on Primary – Serial

18

P3 on Secondary – Serial

3

P4 on Primary – Serial

19

P4 on Secondary – Serial

4

P5 on Primary – Serial

20

P5 on Secondary – Serial

5

P6 on Primary – Serial

21

P6 on Secondary – Serial

6

P7 on Primary – Serial

22

P7 on Secondary – Serial

7

P8 on Primary – Serial

23

P8 on Secondary – Serial

8

R1 on Primary – RS485

24

R1 on Primary – RS485

9

R2 on Primary – RS485

25

R2 on Primary – RS485

12

N1 on Primary – Ethernet 28

N1 on Primary – Ethernet

13

N2 on Primary – Ethernet 29

N2 on Primary – Ethernet


Example:

Data Arrays

Data_Array_Name , Data_Format , Data_Array_Length , Data_Array_Function
DA_Cable_Status

, Bit

, 32

, Cable_Status_Bits

15

The Cable Status bits take 60s for the change in status to be asserted as the system retries a few times when testing the connection. This 60

second delay is a “housekeeping” function and will not affect any process control operation.