PLANET FGSW-2620VM User Manual
Page 28

User’s Manual of FGSW-2620VM
FGSW-2612PVM LED indication
Figure 2-1-9:
FGSW-2612PVM LED panel
System
LED
Color
Function
PWR
Green
Lights
to indicate that the Switch has power.
Per 10/100Base-TX, PoE interfaces (Port-1 to Por-24)
LED
Color
Function
Lights
: To indicate the link through that port is successfully established.
LNK/ACT
Green
Blink: To indicate that the Switch is actively sending or receiving data over that port.
Lights
: To indicate the port is providing 48VDC in-line power.
PoE In-Use
Orange
Off:
To indicate the connected device is not a PoE Powered Device (PD).
Per 10/100/1000Base-T port /SFP interfaces
LED
Color
Function
LNK/ACT 1000
Green
Lit:
indicate that the port is operating at 1000Mbps.
Off
: indicate that the port is operating at 10Mbps or 100Mbps.
Blink
: indicate that the Switch is actively sending or receiving data over that port.
LNK/ACT 10/100
Green
Lit
: indicate that the port is operating at 10Mbps or 100Mbps.
Off
: indicate that the port is operating at 1000Mbps.
Blink
: indicate that the Switch is actively sending or receiving data over that port.
1. Press the RESET button
1-3 seconds
. The t Switch will reboot automatically.
2. Press the RESET button for about
10 seconds
. The Switch will back to the factory default mode; the
entire configuration will be erased.
3. The 2 Gigabit TP/SFP combo ports are shared with port 25/26 of FGSW-2620VM / FGSW-2620PVM /
FGSW-2620VMP4 / FGSW-2612PVM either of them can operate at the same time.