beautypg.com

Magnum Energy RD Series User Manual

Page 28

background image

Page 22

©

2010 Magnum Energy, Inc.

Installation

2.5.5

AC Conductor Wiring

The following steps are basic guidelines for installing and connecting the AC wiring into and out of

the inverter. Refer to Table 2-3 to determine your AC wiring confi gurations before beginning.

WARNING: Before making any AC connections, make sure the inverter is disconnected

from the battery and there is no other source of live power connected to the inverter.

Wiring the Inverter AC Input
1. Remove the two Phillips screws on the AC Access Cover (see Figure 1-3, Item 15) to access

the internal AC Terminal Block (see Figure 2-10).

2. Route the cable from the AC electrical main panel through one of the strain relief clamps to

the AC INPUT. Tighten the strain relief clamp securely on the cable. Always leave a little extra

slack in the wiring.

3. Connect the hot wire (black) from the main panel’s dedicated breaker to the “HOT 1 IN”

terminal. Tighten the “HOT 1 IN” terminal to 16 in lbf (1.8 N-m).

Info: Depending on the AC wiring confi guration, you may need to connect a wire to

the “HOT 2 IN” terminal, refer to your confi guration drawing (Figure 2-11 to 2-14).

4. Connect the neutral (white) from the main panel’s neutral busbar to the “NEUT IN” terminal.

Tighten the “NEUT IN” terminal to 16 in lbf (1.8 N-m).

Wiring the Inverter AC Output
1. Route the cable from the inverter’s AC OUTPUT to the AC electrical sub-panel through the other

strain relief clamp. Tighten the strain relief clamp securely on the cable.

2. Connect the hot (black) wire from the “HOT 1 OUT” terminal to the sub-panel main breaker.

Tighten the “HOT 1 OUT” terminal to 16 in lbf (1.8 N-m).

Info: Depending on the AC wiring confi guration, you may need to connect a wire to

the “HOT 2 OUT” terminal, refer to your confi guration drawing (Figure 2-11 to 2-14).

3. Connect the neutral (white) from the “NEUT OUT” terminal to the sub-panel’s neutral busbar.

Tighten the “NEUT OUT” terminal to 16 in lbf (1.8 N-m).

Wiring the Inverter AC Ground
1. Combine the ground (green) wire from the main panel’s ground busbar and the ground (green)

wire from the sub-panel’s ground busbar. After these grounds are combined, connect them to

the “AC GROUND” terminal. Tighten the “AC GROUND” terminal to 16 in lbf (1.8 N-m).

AC Wiring Inspection
1. Verify all cable runs are secured.
2. Verify strain reliefs or grommets are in place to prevent damage to the wiring or conduit where

it passes through walls or other openings.

3. After verifying all AC connections are correct and all inverter AC terminal screws are torqued to

16 in lbf (1.8 N-m), replace the AC wiring access cover and the covers on the main electrical/

distribution panel.

This manual is related to the following products: