SMA SC 500CP-US User Manual
Page 74

11 AC Connection
SMA America, LLC
74
SCCP-US-IA-US_en-41
Installation Manual
Figure 43: Assembly of the connection with two-hole terminal lugs
Requirement:
☐ The cable requirements must be complied with (see Section 11.2 "Requirements for the Cables and Cable
Additionally required mounting material (not included in the scope of delivery):
☐ Clean cloth
☐ Ethanol cleaning agent
Position
Description
A
Nut M12
B
Spring washer
C
Fender washer
D
Two-hole terminal lug
E
Copper bus bar
F
Screw M12