8  Commissioning the Inverter

SMA America, LLC

56

SB30-40-US-IA-en-34

Installation Manual

8 Commissioning the Inverter

Always commission the inverter according to the following procedure.
Requirements:

☐ The AC miniature circuit-breaker must be correctly rated.
☐ All cables must be correctly connected.
☐ The enclosure lid must be closed and correctly grounded.

1. Remove all covers from the PV array.
2. Switch on the AC miniature circuit-breaker.
3. Turn the rotary switch of the DC Disconnect to the

On position.
☑ The start phase begins. The green LED blinks

3 times per second for 10 s.

☑ The green LED glows and the inverter feeds into

the power distribution grid.

✖ Is the green LED not glowing?

• Observe LED signals and error messages in

the display, and rectify errors
(see Section 10 "Troubleshooting", page 63).