beautypg.com

SMA STP 12000TL-US User Manual

Page 62

background image

6. Switch on all DC disconnectors between the inverter and the PV array.
7. Switch on the circuit breaker and all AC disconnectors.

☑ The green LED is glowing. Feed-in operation begins.

✖ Green LED is flashing?

The DC input voltage is still too low.

• Once the DC input voltage is sufficiently high, feed-in operation begins.

✖ The red LED is glowing?

There is probably an error.

Rectify the error (see Section 10 "Troubleshooting", page 43).

11 Recommissioning the Inverter

SMA Solar Technology AG

Installation Manual

STP12-24TL-US-IA-en-16

62

This manual is related to the following products: