beautypg.com

Figure 4, Terminal connections of power supply cables – HEIDENHAIN PROFIBUS-DP (DPV0) User Manual

Page 13

background image

Encoder gateway installation

13

Encoder gateways equipped with cable glands are delivered with

a dust protection foil from the factory. The protection foil needs to

be removed prior to installing the cables.

It is recommended that gateways equipped with cable glands are

equipped with a shielded power supply cable with conductor area

between 0,34 mm

2

to 1.5 mm

2

. Permissible outer cable diameter

is ø 6 mm to ø 8 mm for the power supply cable. The power

supply screw terminal is located inside the back cover of the

gateway.

In the case were the gateway is the last node in the bus-structure

and only the cable glands for Supply and Bus-in is in use, the Bus

out cable gland should be replaced with a M16 filler plug to

ensure proper sealing.

The +E terminal shall be used to connect +E Volt.

The 0 V terminal shall be used to connect 0 Volt.

Figure 4

Terminal connections of power supply cables

Note:

Tighten all screws in the terminal, even if no cable
has been attached.


Note:

The two +E terminals are connected to each other
and the two 0 V terminals are also connected to
each other, i.e it does not matter to which pair the
+E Volt and 0 Volt are connected to.