beautypg.com

2 shipping information, 1 unpacking and inspection, 2 in the event of shipping damages – AEC WD 350 through WD3000 Dehumidifying Dryers User Manual

Page 14

background image

2 Shipping

Information

2-1 Unpacking and Inspection

You should inspect your Whitlock dehumidifying dryer for possible shipping damage. If the
container and packing materials are in re-usable condition, save them for reshipment, if
necessary.

Thoroughly check the equipment for any damage that might have occurred in transit, such as
broken or loose wiring and components, loose hardware and mounting screws, etc. In case of
breakage, damage, shortage, or incorrect shipment, refer to the following sections.

2-2 In the Event of Shipping Damages

Important!

According to the contract terms and conditions of the Carrier,

the responsibility of the Shipper ends at the time and place of shipment.

The Carrier then assumes full responsibility of the shipment.

Notify the transportation company’s local agent if you discover damage.

Hold the damaged goods and packing material for the examining agent’s inspection. Do not

return any goods to AEC, Inc. before the transportation company inspection and
authorization
.

File a claim against the transportation company. Substantiate the claim by referring to the

agent’s report. A certified copy of our invoice is available upon request. The original Bill of
Lading is attached to our original invoice. If the shipment was prepaid, write us for a
receipted transportation bill.

Advise AEC, Inc. regarding your wish for replacement and to obtain an RMA (return

material authorization) number.

WDMR and WDFR Series Dehumidifying Dryers

Page 13