beautypg.com

About this guide, Purpose of this guide, Questions/issues/concerns – Visara Master Console Center Installation User Manual

Page 7: See also, Organization

background image

Installation Preparation Guide

7

About This Guide

Purpose of This Guide

This guide is intended to help ensure a successful installation of the
Visara Master Console Center (MCC). It outlines site preparation
requirements and installation steps. Critical path milestones are noted
because delays of these tasks directly affect the entire installation
timeline, including the arrival of Visara personnel to the install site.

Questions/Issues/Concerns

For questions, issues, or concerns related to site preparation and
installations please contact your Visara International Sales
Representative.

See Also

For additional information, refer to the Software Installation Guide,
which describes how to install the MCC software or update existing MCC
software.

Organization

Chapter Topic

Chapter 1 Introduction and
Checklist

This chapter provides a brief overview of
what will happen during the installation of

the MCC hardware

Chapter 2 Site Preparation
and Installation Overview

Provides a list of the basic steps involved in
preparing for the MCC installation.

Chapter 3 Power

Requirements

Provides details of needed power and installation

of the power cable provided by Visara.

Chapter 4 MCC Network

Provides details of the TCP/IP network

needed for communication between the
MCC server and user interfaces.

Chapter 5 Connectivity
Interfaces

Details the physical cabling and systems work
required to prepare for the MCC installation.

Chapter 6 Preparation of

User Interfaces

This chapter provides guidance for the

customer in placing and providing cabling

for the Thin Client / workstations from
which the MCC is operated.