Site Preparation

Site preparation activities are principally the responsibility of the
customer; Visara will assist where appropriate.

Project Preparation

ƒ

Assign customer’s personnel to the MCC installation and automation
team(s).

ƒ

Establish goals and timelines, including determining which systems to
interface with and their implementation order. Identify the systems to
implement with highest priority.

Location preparation

ƒ

Determine where to place the MCC rack. Ensure the tile cutouts
needed for cables are completed.

ƒ

Determine where to place the Thin Client / workstation(s).

Network preparation (Chapter 4 MCC Network)

ƒ

Determine how to implement the MCC network for the Thin Client /
workstation(s).

ƒ

Determine what systems to connect to the MCC via telnet/VT100
connectivity.

ƒ

Determine IP addresses and subnets needed for :

-

MCC Servers(s)

-

Thin Client / workstation(s)

-

Each system accessed via telnet

-

Gateways for MCC & Thin Client / workstations(s)

Systems preparation (Chapter 5 Connectivity Interfaces)

ƒ

Determine interface needs and types: RS232/VT100, Telnet/VT100,
SNMP Trap, Coax, etc.

ƒ

Generate mainframe consoles, including OS, system, NIP, and master
configurations.

ƒ

Assign user accounts, particularly for UNIX and AS/400.