Site Preparation
Site preparation activities are principally the responsibility of the
customer; Visara will assist where appropriate.
Project Preparation
Assign customer’s personnel to the MCC installation and automation
team(s).
Establish goals and timelines, including determining which systems to
interface with and their implementation order. Identify the systems to
implement with highest priority.
Location preparation
Determine where to place the MCC rack. Ensure the tile cutouts
needed for cables are completed.
Determine where to place the Thin Client / workstation(s).
Network preparation (Chapter 4 MCC Network)
Determine how to implement the MCC network for the Thin Client /
workstation(s).
Determine what systems to connect to the MCC via telnet/VT100
connectivity.
Determine IP addresses and subnets needed for :
-
MCC Servers(s)
-
Thin Client / workstation(s)
-
Each system accessed via telnet
-
Gateways for MCC & Thin Client / workstations(s)
Systems preparation (Chapter 5 Connectivity Interfaces)
Determine interface needs and types: RS232/VT100, Telnet/VT100,
SNMP Trap, Coax, etc.
Generate mainframe consoles, including OS, system, NIP, and master
configurations.
Assign user accounts, particularly for UNIX and AS/400.